Cable Connection Details
MPEG format around 1MB
Quicktime format around 10MB
Roof Compression Ring Girder Construction
Digging the Foundation
MPEG format around 2.5MB
Pouring the Concrete Compression Ring
MPEG format around 3.8MB
Affixing the Cables
MPEG format around 6.5MB
Tying Down the Fabric
MPEG format around 4.5MB
Final Views Immediately After Inflation
MPEG format around 4.2MB
View of Osaka
Section of Lower Ring Reinforcing Bar
Two Sheets of Teflon
Section of Upper Ring Reinforcing Bar
Concrete Poured and Cable Attached
Fabric Covering
Back to How It Works Menu